Please use the list below to help ensure proper site requirements prior to an installation.
Refer to the Pre-Installation Guide for more detailed information or submit a question now using our online form. To speak with a representative directly, please contact Technical Support by calling:
The entrance to the laboratory is at least 94 cm (37") wide.
The principal operator will be available during the installation period.
The workbench can support the load of the system (325 lbs) and is free from vibration.
The laboratory can be maintained at a constant temperature, between 15° and 27°C (59° and 81°F).
The relative humidity is between 40% and 80%, with no condensation.
The system work area is free from magnetic disruption and electrostatic discharge.
There is a telephone near the system.
There is a suitable exhaust system.
All relevant safety regulations are in compliance.
HPLC is new or recently cleaned, producing pulse free flow from 100-1000 micro-liters per minute.
Solvents: HPLC grade water, methanol, acetonitrile and acetic acid are available.
Sufficient bench space is available for all the equipment, please note width.
The power outlets have been measured. Please note voltages.
The power outlets are the correct configuration. Please note NEMA types.
Provide list of gases that are on-site with gas lines installed and appropriate regulators available. Nitrogen, Helium, N2 Regulator (1/4" connection), Helium Regulator (1/8" connection).
Provide full details of any special acceptance specifications that have been agreed within the contract.
Provide full details of any additional equipment that needs to be interfaced to the system.