Welcome Guest from United States
Sign In Change Country
  0 Items
Search:
DFS - High Productivity - Low Sample Cost
<= previous page => next page

Upgradable at any time!

DFS High Resolution GC/MS
Unique configuration with Trace GC Ultra, TriPlus XT autosampler
and DFS High Resolution GCMS.

Cost savings by using the DFS

New DFS!Typical diffusion pumped MS    
MS1.9 kWMS14.0 kW
GC1.0 kWGC1.0 kW
Data system 0.3 kWData system0.3 kW
Water chiller1.5 kW Water chiller11.0 kW
Sum 4.7 kWSum26.3 kW
Power consumption per year 41 MWh
(= ca. 3,300 EUR*)
Power consumption per year 230 MWh
(= ca. 18,400 EUR*)
 * calculations based on 0.08 EUR/kWh

More than 100.000 € over a depreciation time of 7 years compared to other technologies!



<= previous pageDFS High Resolution GC/MS=> next page